Wash Room Systems
Home > Wash Room Systems
Get a Quote
Wash room systems in the Midlands fail below the surface long before anything shows above it. That’s the whole difficulty with wet areas. Water doesn’t need a hole — it finds the gap between a tile and its grout line, the split in a silicone bead at the floor junction, the unsealed edge around a gully. Then it sits in the screed underneath, works sideways through the substrate and starts growing something. By the time a tile sounds hollow or a stain appears on the ceiling below, the water has been there for a year and the repair means taking the whole floor up.
So we tank the room rather than surface it. The waterproofing goes underneath, coving is formed in the same material as the floor, and the finish runs continuously from drain to skirting with no joints for water to exploit. Ron surveys falls first, because a beautifully installed wet room that ponds is still a failed wet room. Changing facilities, washdown areas and welfare blocks across Westmeath, Offaly and Dublin have been rebuilt this way by our crew, and clients keep returning for further areas — as our customer testimonials show.
Got a wet area that’s leaking, ponding or failing inspection? Call Ron on 086 2631652 for a free survey.
Specification depends on temperature, chemistry and how heavily the room is used.
The sequence protects the structure, and every stage depends on the one before it.
Ron checks existing falls with a level, identifies where water currently sits and inspects drainage capacity. He’ll also look for signs of previous leakage — staining, hollow tiles, damp at skirting level.
Where falls are inadequate, correcting them becomes part of the scope. There’s no point installing a good system onto a floor that ponds.
You get a written, itemised quote covering strip-out, falls, tanking, flooring, coving, wall systems and drainage as separate lines.
Existing tiles, vinyl or failed resin come out. Old adhesive and screed are removed through our floor coating removal service.
The substrate is then prepared mechanically via floor grinding or dust free shot blasting, with everything running through H-class extraction.
Damaged concrete is cut back and rebuilt through concrete floor repairs.
Where falls need forming or correcting, a screed is laid to establish an even gradient to the drainage points — typically around 1:80 for a wet room floor.
This work is invisible in the finished room and it determines whether the room functions. Getting it right is the difference between water leaving and water lingering.
Liquid membrane is applied across the floor, dressed up the walls to above splash height and taken into every drain body.
Corners, upstands and penetrations are reinforced with tape or matting. Pipe entries are sealed individually.
The membrane is left to cure fully and checked before anything goes over it. This layer is the actual waterproofing, so it isn’t rushed.
Coving is formed in resin mortar at every wall junction to the agreed radius and height, before the main floor is laid.
Drain surrounds are detailed so the finish dresses into the gully rather than stopping short of it. Thresholds get an upstand or a trim so water can’t track out of the room.
Polyurethane screeds are trowel-applied to gauge. Epoxy systems are poured, spread and spike-rolled to release trapped air.
Anti-slip aggregate is broadcast into the wet resin at the grade agreed for each zone, then locked in with a sealer coat.
The finish runs continuously into the coving, so there’s no joint at the junction at all.
Cladding is bonded on a full bed and lapped over the coving. Joints are welded or trimmed, and every penetration is cut tight and sealed with antimicrobial silicone.
Where showers, sanitary fittings and brackets are being reinstated, sealing is done as each item goes back rather than afterwards.
Foot traffic returns at around 24 hours. Full water and chemical service comes at 5–7 days at 15–20°C, and cold rooms take longer.
You get product records, slip resistance data and cleaning guidance that won’t degrade the finish. See our before and after gallery for completed rooms.
Hot water, organic acids and constant moisture. Polyurethane screeds with full coving, installed alongside our hygiene floor coating work.
Factory, warehouse and depot facilities. Comfortable underfoot, safe when wet and straightforward to maintain.
Assisted bathrooms, sluice rooms and clinical wet areas where infection control and slip safety both matter.
High footfall, bare feet and constant water. Grip grading is critical, since these rooms need safety without being abrasive.
Grease, steam and heavy traffic in a small area. These floors take more punishment per square metre than almost anywhere else.
Slurry, effluent and pressure washing daily. Chemical resistance matters as much as waterproofing here.
Detergents, water and constant traffic. Often combined with oil resistant flooring in the adjoining workshop areas.
We install wash room systems in the Midlands across Athlone, Mullingar, Tullamore, Portlaoise, Longford Town, Birr and Roscommon Town, with full Dublin and nationwide coverage from our Dublin 3 base.
Wet rooms rarely stand alone. Walls are finished through hygienic wall cladding, while adjoining production areas take hygiene floor coating or chemical resistant flooring. Controlled environments alongside wet areas run through our clean room systems. Preparation and cleaning are handled by floor preparation and pressure washing, while perished joints in adjacent floors need mastic floor joint repairs. Corridors and surrounding areas are usually finished with epoxy flooring to match. Investigating an existing leak? Book a floor inspection and repair visit.
Water is patient. It finds the one gap you didn’t seal, sits in the screed where nobody can see it, and works quietly at the structure for months before anything appears above the surface. By then the damage isn’t the finish — it’s the substrate, the wall behind it and sometimes the ceiling below. Meanwhile a floor that ponds is a slip claim waiting for the wrong morning, and worn anti-slip gives you no defence when it happens.
Wash room systems in the Midlands, delivered by Ron and the crew, are tanked underneath, coved continuously and graded for grip zone by zone. The survey is free. The quote is written and itemised. Most rooms are back in service within a week.
Call Ron: 086 2631652 — direct line, straight answers
Call Office: 014800555 — Sun–Fri, 09:30–17:30
Email: info@midlandsfloorpaintingco.ie
Or send your details through our contact page and we’ll come back to you the same working day, with no obligation.
Fill in your details and we'll get back to you within 24 hours.
Call on 0862631652 or Office Tel 01 2314676 Email us on info@midlandsfloorpaintingco.ie